Modeling and Optimization of Truck-Shovel Allocation to Mining Faces in Cement Quarry | ||
Journal of Mining and Environment | ||
مقاله 2، دوره 11، شماره 1، فروردین 2020، صفحه 21-30 اصل مقاله (1.28 M) | ||
نوع مقاله: Original Research Paper | ||
شناسه دیجیتال (DOI): 10.22044/jme.2019.8329.1712 | ||
نویسندگان | ||
K. Shah* ؛ S. Ur Rehman | ||
Department of Mining Engineering, University of Engineering and Technology Peshawar, Peshawar, Pakistan | ||
چکیده | ||
Truck and shovel are the most common raw material transportation system used in the cement quarry operations. One of the major challenges associated with the cement quarry operations is the efficient allocation of truck and shovel to the mining faces. In order to minimize the truck and shovel operating cost, subject to quantity and quality constraints, the mixed integer linear programing (MILP) model for truck and shovel allocation to mining faces for cement quarry is presented. This model is implemented using the optimization IDE tool GUSEK (GLPK under SciTE Extended Kit) and the GLPK (GNU Linear Programming Kit) standalone solver. The MILP model is applied to an existing cement quarry operation, the Kohat cement quarry located at Kohat (Pakistan) as a case study. The analysis of the results of the relating case study reveals that significant gains are achievable through employing the MILP model. The results obtained not only show a significant cost reduction but also help in achieving a better coordination among the quarry and quality department. | ||
کلیدواژهها | ||
Truck-Shovel allocation؛ mining faces؛ optimization؛ linear programming؛ cement quarry | ||
آمار تعداد مشاهده مقاله: 1,438 تعداد دریافت فایل اصل مقاله: 1,229 |