سامانه مدیریت نشریات علمی دانشگاه صنعتی شاهرود

Farrokh, E.. (1399). TBM Tunneling Construction Time with Respect to Learning Phase Period and Normal Phase Period. , 11(2), 539-554. doi: 10.22044/jme.2020.9041.1792
E. Farrokh. "TBM Tunneling Construction Time with Respect to Learning Phase Period and Normal Phase Period". , 11, 2, 1399, 539-554. doi: 10.22044/jme.2020.9041.1792
Farrokh, E.. (1399). 'TBM Tunneling Construction Time with Respect to Learning Phase Period and Normal Phase Period', , 11(2), pp. 539-554. doi: 10.22044/jme.2020.9041.1792
Farrokh, E.. TBM Tunneling Construction Time with Respect to Learning Phase Period and Normal Phase Period. , 1399; 11(2): 539-554. doi: 10.22044/jme.2020.9041.1792