- Daniel, M., Lane, G., & McLean, E. (2010). Efficiency, economics, energy and emissions-emerging criteria for comminution circuitdecision making. XXV International Mineral Processing Congress, IMPC 2010, 5: p, 3523-3531.
- Zare, S., MalekiMoghaddam, M., & Pourshaabadi, J. (2021). Low-Cost approaches to promote performance of comminution circuit at Steel-Sirjan iron ore complex. Journal of Mining and Environment, 12(4): p. 1065-1076.
- Pokrajcic, Z. (2010). A methodology for the design of energy efficient comminution circuits. PhD Thesis, Sustainable Minerals Institute, The University of Queensland.
- Lage, R., Reyes, F., & Jokovic, V. (2022). Incorporating wear into SAG mill dynamic modelling -implications for process control of grinding circuits. IMPC Asia Pacific, Melbourne, VIC Australia.
- MalekiMoghaddam, M., Arghavani, E., Ghasemi, A.R., & Banisi, S. (2019). Changing sag mill liners type from Hi-Low to Hi-Hi at Sarcheshmeh copper complex based on physical and numerical modeling. Journal of Mining and Environment, 10(2): p. 365-372.
- Amiri, S.H., & Zare, S. (2019). Influence of grinding and classification circuit on the performance of iron ore beneficiation – A plant scale study. Mineral Processing and Extractive Metallurgy Review, 42: p. 1-10.
- Zare, S., Maleki Moghaddam, M., Arghavani, E., Ghasemi, A.R., & Banisi, S. (2019). Efficiency improvement of ball mill liners by simulation of balls and ore trajectory in sarcheshmeh copper complex. Journal of Mineral Resources Engineering, 4(1): p. 135-148.
- Makokha, A.B., & Moys, M.H. (2006). Towards optimising ball-milling capacity: Effect of lifter design. Minerals Engineering, 19(14): p. 1439-1445.
- Rezaeizadeh, M., Fooladi, M., Powell, M.S., & Mansouri, H. (2010). Experimental observations of lifter parameters and mill operation on power draw and liner impact loading. Minerals Engineering, 23(15): p. 1182-1191.
- Bbosa, L.S., Govender, I., & Mainza, A. (2016). Development of a novel methodology to determine mill power draw. International Journal of Mineral Processing, 149: p. 94-103.
- Mishra, B., & Rajamani, R. (1990). Motion Analysis in tumbling mills by the discrete element method. KONA Powder and Particle Journal, 8: p. 92-98.
- Kalala, J., Breetzke, M., & Moys, M.H. (2008). Study of the influence of liner wear on the load behaviour of an industrial dry tumbling mill using the Discrete Element Method (DEM). International Journal of Mineral Processing, 86: p. 33-39.
- McIvor, R.E. (1983). Effects of speed and liner configuration on ball mill performance. Mining Engineering, 35: p. 617-622.
- Delgadillo, J.A., Kumar, P., McPhee, R., Bhattacharjee, T., Abuah, T., Mensah, D., Asakpo, E, & Bonney, S. (2023). Liner optimization of ahafo mine ball mill. SAG Conference, Vancouver.
- Makokha, A., Moys, M.H., Bwalya, M., & Kiangi, K. (2007). A new approach to optimising the life and performance of worn liners in ball mills: Experimental study and DEM simulation. International Journal of Mineral Processing - INT J MINER PROCESS, 84: p. 221-227.
- Rosales-Marín, G., J. Andrade, J., Alvarado, G., Delgadillo, J.A., & Tuzcu, E.T. (2019). Study of lifter wear and breakage rates for different lifter geometries in tumbling mill: Experimental and simulation analysis using population balance model. Minerals Engineering, 141: p. 105857.
- Parks, J.L., & Kjos, D.M. (1990). Liner design, materials and operating practices for large primary mills. Canadian Institute of Mining, Metallurgy and Petroleum.
- Ndimande, C., Hilden, M., & Yahyaei, M. (2023). Evaluating throughput benefits and safety aspects of mill liner design for performance. SAG Conference, Vancouver.
- Powell, M., Smit, I., Radziszewski, P., Cleary, P., Rattray, B., Eriksson, K., & Schaeffer, L. (2006). Selection and design of mill liners. SME Annual Conference, Advances in Comminution.
- Rajamani, R.K. (2000). Semi-Autogenous mill optimization with DEM simulation software. SME, Tools for Optimal Decision Making, PP. 209-214.
- Yahyaei, M., Banisi, S., & Hadizadeh, M. (2009). Modification of SAG mill liner shape based on 3-D liner wear profile measurements. International Journal of Mineral Processing, 91: p. 111–115.
- MalekiMoghaddam, M., Yahyaei, M., & Banisi, S. (2013). A method to predict shape and trajectory of charge in industrial mills. Minerals Engineering, 46–47: p. 157-166.
- MalekiMoghaddam, M., Hasankhoei, A.R., Arghavani, E., Hadizadeh, A., Yahyaei, M., & Banisi, S. (2017). Evolution of AG mill shell liner design at Gol-E-Gohar concentration plant. Journal of Mining and Environment, 8(4): p. 683-691.
- Mousaviraad, M., Ghorbani, S., Nordell, L.K., Stephens, R.L., & Powell, M.S. (2023) Revolutions in SAG mill liner design through DEM modelling. SAG Conference, Vancouver.
- Geoghegan, C., & Haines, C. (2023). Operational debottlenecking of the Cadia 40-Ft SAG mill through constraint mapping analysis. SAG Conference, Vancouver.
- Malkhuuz, G., Zarantonello, A., Supryadi, A., Jaldin, O., Erdenebaatar, B., & Ganbold, M.U. (2023) Optimization and continuous improvement of the oyu tolgoi concentrator. SAG Conference, Vancouver.
- Kingdon, G., & Coker, R.A. (2015). The eyes have it: Improving mill Availability through visual technology. SAG Conference, Vancouver.
- Latchireddi, S., & Morrell, S. (2003) Slurry flow in mills: grate-pulp lifter discharge systems (Part 2). Minerals Engineering, 16(7): p. 635-642.
- Faulkner, C., Lozovoy, N., Kumar, S., & Lee, J. (2019) Increased throughput from liner design initiatives in the Aktogay 40 Ft SAG mill. SAG Conference, Vancouver.
- Vasile, M. (2019). Comparative study of mill discharge system using coupled DEM SPH simulations. SAG Conference, Vancouver.
- Hlungwani, O., Rikhotso, J., Dong, H., & Moys, M.H. (2003). Further validation of DEM modeling of milling: effects of liner profile and mill speed. Minerals Engineering, 16(10): p. 993-998.
- Powell, M. & Valery, W. (2006). Slurry pooling and transport issues in SAG mills. SAG Conference, Vancouver.
- Ghasemi, A.R., Mousavi, S.O., & Banisi, S. (2014). Effect of time step on the accuracy of DEM calculations. IMPC 2014, 27th International Mineral Processing Congress.
- MalekiMoghaddam, M., Yahyaei, M., & Banisi, S. (2012). Converting AG to SAG mills: The Gol-E-Gohar Iron Ore Company case. Powder Technology, 217: p. 100-106.
- Powell, M.S., Weerasekara , N.S., Cole, S., LaRoche, R.D., & Favier, J. (2011). DEM modelling of liner evolution and its influence on grinding rate in ball mills. Minerals Engineering, 24(3): p. 341-351.
- Chen, W., Hazell, M., Moreno, C., Larose, G., Faulkner, C., & Coray, D. (2023). Enhancing AG milling circuit performance through advanced liner design, modelling, material selection and digital tool. SAG Conference, Vancouver.
- Toor, P., Franke, J., Powell, M.S., Bird, M., & Waters, T. (2013). Designing liners for performance not life. Minerals Engineering, 43-44: p. 22-28.
- Yahyaei, M., Powell, M.S., Toor, P., Tuxford, A., & Limpus, A. (2015). Relining efficiency and liner design for improved plant performance. Minerals Engineering, 83: p. 64–77.
- Bian, X., Wang, G., Wang, H., Wang, S., & Lv, W. (2017). Effect of lifters and mill speed on particle behaviour, torque, and power consumption of a tumbling ball mill: Experimental study and DEM simulation. Minerals Engineering, 105: p. 22-35.
- Royston, D. (2006). Developments in SAG mill liner design. SME Annual Conference, Advances in Comminution, p. 399-411.
- Toor, P., Swart, M., & Stahlbrost, H. (2017). The evolution of SAG shell lining and introduction of the skip row design. Metallurgical Plant Design and Operating Strategies, Perth, Australia
- Mishra, B.K. & Rajamani, R.K. (1992). The discrete element method for the simulation of ball mills. Applied Mathematical Modelling, 16(11): p. 598-604.
- Li, G., Roufail, R., Klein, B., Zhou, L., Kumar, A., Sun, C., Kou, J., & Yu, L. (2019). Investigations on the charge motion and breakage effect of the magnetic liner mill using DEM. mining, Metallurgy & Exploration.
- Yin, Z., Peng, Y., Zhu, Z., Yu, Z., & Li, T. (2017). Impact load behavior between different charge and lifter in a laboratory scale mill. Materials Engineering, 10: p. 882.
- Djordjevic, N. (2003). Discrete element modelling of the influence of lifters on power draw of tumbling mills. Minerals Engineering, 16(4): p. 331-336.
- Kluge, K., Collinao, E., Segovia, M., Medina, A., Moscoso, C., & Rendon, A. (2023) A novel framework for studying loads on SAG mill liners using the impact finder system, and DEM and FEM simulations. SAG Conference, Vancouver.
- Barani, K. (2017). The effect of ball size distribution on power draw, charge motion and breakage mechanism of tumbling ball mill by discrete element method (DEM) simulation. Physicochemical Problems of Mineral Processing.
- Kolahi, S., & Jahani, M. (2020). Investigation of effect of number of lifters on performance of pilot scale SAG mills using discrete element method. Journal of Mining and Environment, 11(3): p. 675-693.
|